5 Steps for Standing Seam Roofing

Copper standing seam roofing

For when you are doing your standing seam roofing, here five quick tips to make your job that little bit better:

Step 1 - Allow an additional 3 - 5mm at the bottom of your sheet when you turn at the box gutter or eaves gutter.

Step 2 - Allow a 5 - 10mm gap at the top of all sheets from a wall. This will allow the sheet to expand in both directions and help minimise your expansion issues.

Step 3 - Use Enka venting under all profiles at all times, this really helps with condensation problems and can also pick up any slack in your base structure.

Step 4 - Don't be afraid to file your sheet terminations before you start to dress them, this will minimise the chance of a rip in your termination.

Step 5 - The age old classic: measure twice and cut once or measure three times order once!!!!

Add to Flipboard Magazine.

Get in touch with us

Companies we Represent

VMZinc Ace Gutters Stramit Velux Skydome Solatube Colorbond Bluescope Steel KME Copper Proctor Wrap DEKS Ecolife Solutions Freund Ampelite Buildex Karben-Industries Soudal Stinger

Notice

Prestige wishes to advise the following. That all metals will expand and contract at different rates. This expansion can and will move adhesives overtime and can result in a natural wave to a metal materials. This is not a defect but a natural occurrence when working with sheet metal. Prestige will work to the closest of tolerance but reserves the right to a margin of 2.5mm tolerance on products and services provided. Prestige can not warrant nor accept any responsibility on any product once removed from the main premises of prestige for external treatment or other applications out side of the original manufactured state, not limited to the unknown use of products after purchase.